T-009 · TIMBER SYSTEM
Hidden floor III
Timber-system component or spatial unit
- Period
- Liao-period original fabric with successive repairs
- Storey
- Between third and fourth storeys
- Location
- Structural interstorey
- Verification
- 部分核实

Daoru Wang、Stephanie Yanqiu Li、Ruguan Liu、Jianxin Hu、Ang Wang / Buildings 14(8):2464 / MDPI · CC BY 4.0
View image source ↗

Daoru Wang、Stephanie Yanqiu Li、Ruguan Liu、Jianxin Hu、Ang Wang / Buildings 14(8):2464 / MDPI · CC BY 4.0
View image source ↗
Abstract
The third concealed structural ring.
Research note
This entry is a system-level index. Exact dimensions, species, damage, replacement dates and node identifiers should connect to a formal survey database.